This Rollbahn diary features a Gantt chart page, allowing you to manage multiple projects and schedules horizontally. Featuring adorable animals in various poses, this diary is perfect for planning your days.
Available in four designs: Light Pink (Panda), featuring a mother and baby panda cuddling; Blue-Gray (Cat), featuring a dignified black and white cat; Mint (Long-Titted Tit), featuring a round, white, long-tailed tit with an innocent expression; and Brown (Fox), featuring a striking, warm color combination.
The logos are green foil for the Light Pink (Panda), light yellow foil for the Blue-Gray (Cat), navy foil for the Mint (Long-Titted Tit), and silver foil for the Brown (Fox). They depict scenes featuring adorable animals, even in their gestures.
The popular L size is close to B6 size. Each month alternates between a double-page monthly calendar and a Gantt chart page.
This Gantt chart allows you to enter nine events along the horizontal axis, giving you an overall view of your monthly schedule.
It's useful for project progress management in business and for personal study planning for exams. It can be used in a variety of ways to suit your style, such as as a daily assignment checklist or life log.
It's made of high-quality cream-colored paper that prevents ink bleeding and show-through. The front of the book features a yearly calendar and yearly schedule, and the back features 135 5mm grid memo pages and five convenient clear pockets.
The cover is coated with a transparent film, ensuring it will last a full year.
We also recommend the Rollbahn Diary Log Chart Animal L, which features a calendar and vertical chart on a double-page spread.
This design is also available in monthly ring-type M, L, and A5 sizes, as well as log charts, and monthly stapled notebook-type A6, B6, and A5 sizes, as well as log charts, Gantt charts, and Delfonics diaries.
Size: Gantt Chart L Country of Origin: Japan Material: Paper
Type: Monthly
Size: 148mm W x 183mm H x 20mm D
Specifications: 135 memo pages, 5mm grid, perforated tear-off slits, 5 PP pockets
Available from: October 2025 to December 2026